Special Constructions

64d0d4195c

Sealing of several supply or disposal lines.
Constructed and produced for renovation of an airport tower.

Split sealing in front of wall in acc. w. DIN 18195 with fixed and lapped flange with the use of polymer-modified thick bitumen coatings.
For sealing off previously-laid pipes; against pressurising water
Leadthrough of several pipes:

  • 7 x DN 200
  • 1 x DN 100

Material: ggv sand-surfaced.
Further scope of delivery:

  • Curaflex® sealing inserts C/T/S for sealing off media pipes
  • Curaflex® accessories for thick coatings

(1776): “sandblasting of contact surfaces”


9f204761a9

Retrospective sealing of various supply and disposal lines.

Constructed and produced for conversion works in a commercial building.
Split liner pipe with central flange. For sealing off previously-laid pipes; against pressurising water.
Leadthrough of several pipes: 12 x DN 80.
Material: ggv
Further scope of delivery: Curaflex® C sealing inserts


64c158d16c

Sealing of roof feedthrough with fixed and loose plans with the use of waterproof membranes.

Constructed and produced for extension of an industrial building.
Roof feedthrough with 2 x fixed and lapped f lange with the use of waterproof membranes for two sealing layers; against non-pressurised water.
Feedthrough of a DN 80 line.
Material: stainless steel 1.4301.
Further scope of delivery: Curaflex® A sealing insert A


0e893b2be1

Multiple sealing of varying supply and disposal lines.

Constructed and produced for the renovation of a public educational establishment.
Sealing off with fixed and lapped flange with use of waterproof membranes; against non-pressurised water.
Leadthrough of several pipes: 2 x DN 200.
Material: stainless steel 1.4571/1.4404
Further scope of delivery: Curaflex® A sealing inserts

2a58d193d0

Split sealing of gas pipe wall penetration.
Constructed and produced for a production hall in the chemical industry.

Split sealing insert DN 3000.
For sealing off previously-laid pipes; against pressurising water. Provided with fastening lugs for fixing.
Material:

  • Frame ring: stainless steel 1.4301
  • Sealing rubber: NBR

12e053a2b0

Sealing for wall leadthroughs of supply lines.

Special requirements:
Retention of existing structural substance despite extensive renovation of lines.
Constructed and produced for the renovation/conversion of a listed residential building.
Split sealing in front of wall in acc. w. DIN 18195 with fixed and lapped flange with the use of waterproof membranes.
For sealing off previously-laid pipes; against pressurising water.
Feedthrough of DN 250 line
Material: ggv
Further scope of delivery:
Curaflex® sealing insert C/T/S for sealing off media pipes


c6e56f6267

Sealing of inclined wall penetrations containing several data and power lines.

Constructed and produced for the new construction of a computer farm.
Sealing in front of wall in acc. w. DIN 18195 with fixed and lapped flange with the use of waterproof membranes; against pressurising water.
Leadthrough of several pipes: 4 x DN 400.
Material: ggv
Further scope of delivery: Curaflex® C sealing inserts


cc96c963dc

Multiple sealing for wall leadthroughs.

In each case a district heating feed and return line in the form of plastic casing pipes.
Constructed and produced for the conversion and renovation of an administration building.
Sealing in front of wall in acc. w. DIN 18195 with fixed and lapped flange with the use of waterproof membranes.
For sealing off previously-laid pipes; against pressurising water.
Leadthrough of several pipes: 2 x DN 200.
Material: ggv.
Further scope of delivery: Curaflex® Quick In C 40 sealing inserts for sealing off media lines.